Infrastructure, Building & Workshop

Infrastructure, Building and workshop

Sl.No

Ownership document/lease agreement for rented building

In square metres

Link to scanned document/image

 

Totel Area

 3250.00

 
 

Covered Area

 995.0

 
 

Totel Class Rooms Area

 175.08      
     
 

Totel workshops Area

 294.89      
 

Drawing Hall

 69.014  
 

Audio visual Hall

 69.014  
 

Computer Lab

 58.740  
 

Play Area

 543.49  
 

Library

 35.61  
 

Remarks

   

 

Trade

Unit

Class
Room
Area per Unit

Total class room area for Trade

Workshop area per unit

Total Workshop area for Trade

Remarks (Photograh, etc for link)

 

           
             

2.Electric Power Supply

Present Electric Load

20KW (in KW)

Hyperlink to document proof

Date of Connection

 28.06.2014 15kw  

Connection in the name of

 Principal Savitribai Fule Private Industrial Training Institute  

Meter No.

   

Seal No.

   

Remarks